The equipment of the North Sea oil and gas industry
People starting out in offshore oil and gas meet a lot of new names for kit in their first weeks. Each piece belongs to a stage of the work, from drilling a well to taking a platform away at the end of its life.
The UK's regulators explain much of it in their own guidance.
Wells and the equipment that controls them
In the words of HSE, Britain's Health and Safety Executive, "Oil and gas wells connect offshore installations to the reservoirs below them." HSE treats a blowout of oil or gas from a well as a major accident hazard, because it can lead to a major fire and explosion.
HSE expects the companies running wells to have their well control equipment verified by independent and competent third parties.
The North Sea Transition Authority, known as the NSTA, reported in October 2026 that new subsurface safety valves, downhole pumps and plugs are being developed for work on existing wells.
Cranes and lifting
HSE describes crane operation as "an inherent part of offshore oil and gas operations". Cranes move supplies and materials on and off the installation.
It also gives a sense of scale. "Injuries and dangerous occurrences arising from lifting operations account for about 20% of the total of those occurring offshore."
Pipelines and pigs
Pipelines carry oil and gas, and some connect several fields to a host platform. They come under the Pipeline Safety Regulations 1996, which HSE says apply in Great Britain, in territorial waters and on the UK Continental Shelf.
Pipelines are inspected from the inside as well. The NSTA describes an intelligent pig as "a device equipped with sensors that can be pushed through pipelines, inspecting and measuring as they go".
Platforms that float
HSE's maritime integrity guidance covers every floating installation, including jack-up drilling units.
HSE names two maritime hazards for them. One is loss of stability, from a collision or flooding. The other is loss of position, if the mooring or the dynamic positioning system fails.
Taking it away again
A well that will not produce again has to be decommissioned. For wells on the seabed, the NSTA explains that rigs carry out the first stages, plugging the well with cement to prevent leaks. Removing the wellhead from the seabed is the final step.
The NSTA's figures show operators carried out decommissioning work on 257 wells in 2025.
Who runs the UK sector
The NSTA describes its own role in one line: "We regulate and influence the oil and gas, offshore hydrogen, and carbon storage industries."
HSE looks after health and safety offshore. Its offshore law pages explain what operators, owners, employers and workers each have to do.
OPITO develops training and competence standards for the energy industry. It says 500,000 people are trained to its standards every year.
For a small firm hoping to supply the industry, the NSTA runs a portal called Energy Pathfinder. Developers use it to advertise tenders for oil and gas, decommissioning, carbon capture and storage (CCS), wind, geothermal and hydrogen projects.